Case Studies
Epic Scaffolding delivers on Adelaide’s most demanding construction, infrastructure and heritage projects. Each case study below documents the engineering, the constraint, and the outcome — so head contractors scoping similar work can see exactly how Epic approaches it.
Birkenhead Bridge, Port Adelaide
The job: continuous underside access to the Birkenhead Bridge deck for maintenance works over the Port River. The bridge sits above tidal water in an active navigational corridor, …
Read the case study →Flinders University Footbridge
The job: complete structural and coating access to the Flinders University Footbridge across its full span. The footbridge carries daily pedestrian traffic between the university a…
Read the case study →Adelaide Festival Theatre roof scaffold
The job: continuous facade access for roof works on the Adelaide Festival Theatre. The theatre sits in a live cultural precinct with public foot traffic on multiple sides, a distin…
Read the case study →Adelaide GPO Exchange materials hoist
The job: sustained vertical material movement on the Adelaide GPO Exchange multi-storey works programme. The site was tight, the tower crane was constrained, and running fit-out ma…
Read the case study →Karen Rolton Oval, 50 kN engineered pole propping
The job: temporarily support an existing stadium lighting pole so works could be carried out safely at the base without loading the pole through the ground fixing. The pole itself …
Read the case study →Thomas Foods International, Murray Bridge
The job: safe, fall-protected access to a raised slab at the Thomas Foods International Murray Bridge facility, delivered for head contractor Ahrens. A 2 m stretcher access scaffold with 60 lineal metres of face-mounted perimeter handrail, erected in 1.5 days by a two-man Epic crew …
Read the case study →Flinders Port, Outer Harbour, 32 m engineered walkway
The job: safe pedestrian access across a 32-metre span of an empty settling pond at Flinders Port, Outer Harbour, delivered for head contractor CIP Constructions. An engineered Proscaf ringlock walkway on supports at each end, signed off by DC Engineering (CPEng) …
Read the case study →SA Water Hope Valley, silo base birdcage access
The job: removing stainless steel rings from the base of a silo at the SA Water Hope Valley Water Treatment Plant on Grand Junction Road, delivered direct to SA Water. A 3.2 m by 2.57 m birdcage access scaffold with a 1-metre high working deck …
Read the case study →Thomas Foods International, Lobethal, 9 m builders stair and loading platform
The job: trade access up to levels 1 and 2 at the Thomas Foods International facility at Frick Road, Lobethal, delivered for head contractor Ahrens. A nine-metre builders stair and a 2.5 m x 6 m loading platform for insulated panels …
Read the case study →Have a project that needs an engineered scaffold solution?
Request a free site visitor call 0410 486 750